Expanded 20,000 m² Foshan Facility and Automated Powder-Coating Line
FactoryPublished Updated
In November 2025, Jianpin completed two physical upgrades at our Foshan plant: expanding production floor space past 20,000 square meters and bringing a fully automated overhead powder-coating line into operation.

One plant covering outlets, dampers, and access doors
Since 1999, our shop floor has focused on HVAC air distribution components: ceiling diffusers, wall and return grilles, volume control, fire, and backdraft dampers, access panels, and custom OEM/ODM sheet-metal assemblies. Keeping expanded fabrication and finishing together lets mixed orders from our product catalog share one production schedule and one finish batch.
Layout changes and a 2,500 m² warehouse
Higher container volume creates congestion fastest between final assembly and dispatch. Moving past 20,000 square meters gave us room to straighten assembly and packing flow and carve out 2,500 square meters specifically for finished-goods warehousing, shortening staging bottlenecks on large-volume and repeat orders.
Moving powder coating onto an automated conveyor line
The overhead conveyor moves frames through the coating line on hangers. Parts can travel together through powder application and curing. Operators still check coverage along the inner edges of the grille and compare the finished color with the approved sample.

Veteran operators and ERP tracking
Equipment changes work best alongside steady process discipline. Many of our core technicians and line operators have been with Jianpin for over ten years. Combined with our ISO-certified quality management system and ERP production control, orders are tracked from incoming raw metal through outgoing batch inspection.
What this supports going forward
The expanded hall and automated coating line give our Foshan team more breathing room for higher-volume schedules and custom finishes without trading away consistency between shipments.




